
4 IMR01Y06-E6
2. HANDLING PROCEDURES
Conduct the setting necessary for performing communication in accordance with the following
procedure.
To avoid error at operation start-up, COM-JC must be powered on LAST (after the
Controller, PLC, etc.).
Mounting
Install the COM-JC.
•
Refer to 3. MOUNTING (P. 5)
•
For controller, refer to FB100 Installation Manual
(IMR01W12-E) or FB400/FB900 Installation
Manual (IMR01W01-E)
COM-JC Setting
Wiring and
Connection
PLC and Controller
Settings
Device Assignment
Set the CC-Link station number, Communication speed and
Occupied station/Extended cyclic of COM-JC and Controller
communication speed.
Refer to 5. SETTING (P. 16)
Connect power supply wires to the COM-JC, and also connect
the COM-JC to the controller and the COM-JC to the PLC,
respectively.
•
Refer to 4. WIRING (P. 8)
•
For controller, refer to FB100 Installation Manual
(IMR01W12-E) or FB400/FB900 Installation
Manual (IMR01W01-E)
Set the PLC and controller.
• Refer to 8.3 Use Instruments Setting (P. 83)
•
For controller, refer to FB100 Communication
Quick Manual (IMR01W15-E) or FB400/FB900
Communication Quick Manual (IMR01W07-E)
Do assignments of Remote input/output and Remote register.
Refer to 8.4 Device Assignments Example (P. 85)
Program Creation
Create the sequence program of PLC.
Refer to 8.5 Sample Program (P. 88)
Commenti su questo manuale